- Safety/Hoist Wire Ropes Deflector
- Sheaves, Keyed Shafts
- Safety/Hoist Shafts
- Safety/Hoist Bearings
- Safety/Hoist Supports
- Sheaves
- Shafts for Sheaves
- Bearings for Sheaves Shafts
- Safety Brake Actuator
- Safety Brake Supports
- Nondestructive Testing on Hoisting
- Machinery Shafts
- Replace the East & West Operating
- Brake Wheels
- Perform Internal Inspection of Bearings
- Miscellaneous; Support Steel, Shims, Bolts, Etc.
- Deck, Operators Booth & Roof Removal
- Install New Wireless Integrated Speaker System
- 2 - Way Communication
- Electrical Demolition
- Upgrade Electrical Service
- Replace Med. Voltage Motor Starter with Low - Voltage VFD
- Inclined Plane's Low - Voltage Aux. Equipment,
- Raceway & Wiring
- Inclined Plane's Control System
- Packaged Backup Emergency Generator
- Remove & Install New Track Lighting Conduit
- Install New Splice Box at Lower Station
- Install New Incline Lighting Boxes
- Install New Incline LED Lights
- Install Programmable Logic Control
- Install New Railcar Interior Lights
- Install New Railcar Exterior Lights
- Window Glazing
- HVAC System
Recent Press Releases
Click on Updates for Inclined Plane Issues:
Final Technical Sheaves Evaluation
Appendix A - Haul Sheaves Photo Survey
Appendix B - Safety Sheaves Groove Photo Survey
Previous Press Releases:
Click through to find photos directly from the rehabilitation work site!